Aging Inspection | 2/25/2015 | 2/25/2015 | 2/25/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 2/25/2015 | 2/25/2015 | 2/25/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete Temp BMP's removed no esc issues
|
Aging Inspection | 12/25/2014 | 12/25/2014 | 12/26/2014 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Andy J. Long
|
|
|
Call Luke and will meet on site at appropriate time. Pre-dig erosion control conference. Phone #: ###-#### Inspection requested via web by Lucas Christian
Site has been prepped. Perimeter wattles protect 6th and Ada sidewalks. Construction access will be through alley, told RP okay to remove wattle there because it will just get driven over. No adjacent DI next to project. Permit posted. There will be a basement so dirt will be offhauled. Any trackout will need sweeping/removal. Approved for construction.
|
Issue & PRINT permit SFD | | | 7/16/2014 | | DONE |
|
|
|
|
Application received | | | 6/20/2014 | | |
|
|
|
|