General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete on warehouse TI project. Area of disturbance outside is contained within cement curbing and pathway and has been covered with bark mulch. No loose sediment or materials on site. ESC permit finaled.
|
DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PASS |
Andy J. Long
|
|
|
Warehouse demo & new addition is in progress. No disturbed area or loosed sediment on front of building on Westpark. Permit is posted with contact info. The rear parking lot to the south has had some trench work that is not yet patched over so there is some loose sediment. The grassy swale inlet has sandbag to collect dirt. No trackout. Will be swept after paving.
Site is in compliance with permit conditions.
|
General Inspection | 10/16/2014 | 10/16/2014 | 10/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for 10/20
|
Issue & PRINT permit COM | | | 7/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 7/15/2014 | | 7/15/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid RP and PD designated.
|
Application received | | | 6/25/2014 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/25/2014 | | 6/25/2014 | | FAIL |
Andy J. Long
|
|
|
No waiver included in ePlan documents
|