Aging Inspection | 9/21/2015 | 9/21/2015 | 9/21/2015 | | PASS |
Andy J. Long
|
|
|
Work complete. All permits finaled. Homeowner working on yard/garden. No sediment leaving site, construction materials have been removed.
|
DOC - Permit Finaled | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | CANC |
Evan Jenkins
|
|
|
|
Aging Inspection | 5/19/2015 | 5/19/2015 | 5/19/2015 | | PASS |
Andy J. Long
|
|
|
Some landscaping and site improvement is ongoing. Will final after stabilization and project completion. No discharges or trackout from site down alley way.
|
Aging Inspection | 3/18/2015 | 3/18/2015 | 3/18/2015 | | PASS |
Andy J. Long
|
|
|
Duplex is near completion. No further earthwork and no loose sediment. Will need to conduct final site cleanup and removal of construction materials.
|
Aging Inspection | 1/16/2015 | 1/16/2015 | 1/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 8/18/2014 | 8/18/2014 | 8/18/2014 | P | PASS |
Andy J. Long
|
|
|
site prep inspection Noah @ 2:00 PM
Met RP Noah onsite. Project is at the rear of the existing building. Stockpiles are to be off-hauled once foundation (slab on grade) is dug, will protect stockpiles if left onsite.
Nearest downstream MS4 DI is on 6th street and Franklin. Sheet flow goes to alley and landscaped area next to project. Permit posted on fence. Construction will begin tomorrow.
|
Issue & PRINT permit SFD | | | 8/15/2014 | | DONE |
|
|
|
|
Application received | | | 7/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2014 1:56PM
|