General Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 | | PASS |
Andy J. Long
|
|
|
Level 3 interior TI complete. BLD finaled. No disturbed area, waste materials or stockpiles remaining on site. ESC permit finaled.
|
DOC - Permit Finaled | 1/15/2015 | 1/15/2015 | 1/15/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 | | CANC |
Evan Jenkins
|
|
|
due to dangerious snow conditions/road ways, unable to make it to the inspection
|
Issue & PRINT permit COM | | | 8/22/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 7/31/2014 | | 7/31/2014 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated.
|
Application received | | | 7/21/2014 | | |
|
|
|
|