General Inspection | 4/7/2015 | 4/7/2015 | 4/7/2015 | | PASS |
Andy J. Long
|
|
|
Home is complete, landscaped, and hillsides surrounding home have been hydroseeded. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
Home construction is complete. Landscaping in progress. Disturbed hillside areas around site perimeter have been hydroseeded.
Rill erosion caused previously has been regraded and rooftop storm drains are now connected to the subdivision stormwater stub-system.
|
General Inspection | 3/6/2015 | 3/6/2015 | 3/6/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2015 | 2/19/2015 | 2/24/2015 | | PEND |
Andy J. Long
|
|
|
RP having landscaping crew come repair rill/gully erosion on site.
No sediment trackout/runoff to Mountainside or storm drain system. Will check back for status of repairs. No other corrections needed.
|
Site Preparation | 2/3/2015 | 2/4/2015 | 2/4/2015 | P | PART |
Andy J. Long
|
|
|
Note - not a site prep inspection, home already in progress, general inspection.
No trackout or blowout of sediment to streets, gutters and storm drains. Permit posted and trash is contained.
Rooftop drainage is not yet installed so runoff has created a rill erosion on slope of site. To fix slope will need to be raked and tracked or gravel check dams installed to filter out flow.
Most sediment has been trapped at perimeter wattle. Notified Bruno built contact Jeremy about the issue. Needs action before getting worse.
|
General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled for 2/4
|
General Inspection | 1/19/2015 | 1/19/2015 | 1/20/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No hillside erosion or construction activity on the slopes on and and around the property. Minimal parking so street is very congested with winter safety sand on roadway. No spills or discharges. Permit posted. No correction requests at this time.
|
General Inspection | 1/1/2015 | 1/1/2015 | 1/2/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No hillside erosion occuring, vegetation has been preserved. Contractors keeping vehicles off dirt/mud. Permit posted, BMPs installed. No corrections at this time.
|
General Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 | | CANC |
Andy J. Long
|
|
|
covered in snow, hillside home, unable to inspect due to snow
|
Random Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | P | PART |
Andy J. Long
|
|
|
No sediment or erosion issues but the portable toilet has been tipped over. Unclear if it was an accident, wind, or vandals.
Called Bruno Built contact Jeremy to alert him of the spill and advised that once the spill has been cleaned to make sure that the unit is staked down and not on the sidewalk.
He said he will start clean up process ASAP and all ABC Toilets.
|
Site Preparation | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PART |
Andy J. Long
|
|
|
No site prep inspecton requested.
BMPS installed and hillside vegetation has been preserved. No trackout or other issues at this time.
Bruno Built needs to continue requesting site prep inspections even if sites have been in compliance.
|
Issue & PRINT permit SFD | | | 9/3/2014 | | DONE |
|
|
|
|
Application received | | | 7/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 23 2014 11:56AM
|