General Inspection | 4/29/2015 | 4/30/2015 | 4/30/2015 | A | PASS |
Andy J. Long
|
|
|
Pool is complete. Materials have been removed and cleaned. Wattle is okay to remain on adjacent lot because it will be used during the SFH home that is planned on the site and is below the hillside erosion down from Alto Via lots...
No further inspections. Permit finaled.
|
DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled 4/30
|
General Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 | | PASS |
Andy J. Long
|
|
|
Pool construction near completion. Need to remove remaining landscaping materials not used from the adjacent lot and remove or stake in straw wattle. No offsite discharges or trackout. Will check back.
|
General Inspection | 3/26/2015 | 3/26/2015 | 3/26/2015 | | PASS |
Andy J. Long
|
|
|
Pool construction currently incactive. No sediment runoff or trackout from adjacent parcel used to access pool area.
|
Aging Inspection | 3/6/2015 | 3/6/2015 | 3/6/2015 | | PASS |
Andy J. Long
|
|
|
No activity. Pool partially complete. Will resume this spring. No issues at site related to the pool construction.
|
Random Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Andy J. Long
|
|
|
Pool project with landscaping was not completed before winter. Site is currently shutdown with a wattle trenched in at former vehicle access entrance. Permit is posted in front of house and no sediment runoff or trackout observed.
|
Random Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PASS |
Andy J. Long
|
|
|
Pool installation with retaining wall is still in progress. No trackout or erosion issues at site, but will need to stablize adjacent lot and remove temporary BMPs.
|
Site Preparation | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Andy J. Long
|
|
|
call first to meet / Ryan Phone #: ###-####
New pool installation at existing foothills home. Permit posted, DI has inlet protection, and meet RP Ryan onsite. Access will be through adjacent lot. Daily sweeping of trackout will occur.
Approved.
|
Routing - Erosion and Sediment | 8/27/2014 | | 8/28/2014 | | DONE |
Andy J. Long
|
|
|
ESC narrative submitted with site map. Site prep inspection already conducted. Approved.
|
Issue & PRINT permit SFD | | | 8/27/2014 | | DONE |
|
|
|
|
Application received | | | 8/27/2014 | | |
|
|
|
|