Telephone call | | | 5/21/2015 | | DONE |
|
|
|
talked to Gordon Clark he said he was not working as GC and RP but the job was done before he left just no finals were called in.
|
General Inspection | 5/4/2015 | 5/4/2015 | 5/4/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse addition/lean to has footings and frame in place. No further earth disturbance and staging yard is in pre-existing condition. ESC permit condtions satisied, no further inspections required.
|
DOC - Permit Finaled | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | | PASS |
Andy J. Long
|
|
|
Footprint of building addition is complete. Interior work remaining. No disturbed or loose dirt remaining on site, project surrounded by large paved warehouse yard. Permit open to complete construction. No violations.
|
Site Preparation | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PASS |
Andy J. Long
|
|
|
Gordon ###-####
Perimeter wattles installed. Permit posted. Glaztech is supervising the sub-contractors on the job. Low risk site. RP mistakenly filed eNOI but site disturbance is less than 1 acre and is not required.
Approved for warehouse addition construction.
|
Permit Ready to Issue | | | 11/6/2014 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 9/9/2014 | | |
|
|
|
|