DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 | P | PASS |
Andy J. Long
|
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
Aging Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | | PASS |
Andy J. Long
|
|
|
Home construction is complete, but need to landscape and stabilize to close ESC permit.
No trackout or sediment leaving site and it is graded for landscaping to be installed.
Need to clean stucco waste collected on adjacent lot.
|
Site Preparation | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | PASS |
Andy J. Long
|
|
|
Tahoe Home is East Valley
Permit posted. EV stormdrain inlets have filter bag protection and lined concrete washout is provided. Site is flat with no surface water. Will need to keep contractors from parking on mud. First home in East Valley. Construction to begin tomorrow.
|
Site Preparation | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | CANC |
Andy J. Long
|
|
|
Clint Phone #: ###-####
rescheduled for PM
|
Issue & PRINT permit SFD | | | 10/9/2014 | | DONE |
|
|
|
|
Application received | | | 9/30/2014 | | |
|
|
|
|