General Inspection | 3/14/2016 | 3/14/2016 | 3/14/2016 | | PASS |
Andy J. Long
|
|
|
Work complete and hangar is occupied. Hydroseeded areas are now established and permanent onsite stormwater facilities are in place. No corrections, permit conditions satisfied. All permits finaled.
|
DOC - Permit Finaled | 3/14/2016 | 3/14/2016 | 3/14/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/11/2016 | 2/11/2016 | 2/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2015 | 12/10/2015 | 12/10/2015 | | PASS |
Andy J. Long
|
|
|
revegetation of hydroseeded areas in progress. No trackout or sediment leaving site.
|
General Inspection | 11/9/2015 | 11/9/2015 | 11/10/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/8/2015 | 10/8/2015 | 10/8/2015 | | PASS |
Andy J. Long
|
|
|
WIP around hangar site. No trackout, fugitive dust, or discharges observed. Disturbed areas have been tacified and seeded. No significant growth yet. No corrections needed.
|
General Inspection | 9/7/2015 | 9/7/2015 | 9/8/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. Open areas have been hydoseeded and are establishing. BLD with project is finaled. Will final seperate TI with ESC permit ESC14-01128.
No trackout, fugitive dust, or other issues. Hangar is occupied.
|
General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP on hangar interior and also site improvements. No trackout, fugitive dust, or erosion issues on site.
|
General Inspection | 7/6/2015 | 7/6/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2015 | 6/5/2015 | 6/5/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Andy J. Long
|
|
|
Skywest Hangar construction continues. Interior work and site development and preparation of taxi runway has started staging. No trackout from site, no fugitive dust observed from active stockpiles. Approved.
See also ESC14-01128
|
General Inspection | 4/2/2015 | 4/2/2015 | 4/2/2015 | | PASS |
Andy J. Long
|
|
|
Work on hangar is in progress. Site grading is complete, no stabilization has occured yet - no wind blown dust or fugitive dust has not become an issue - but will need to be considered as conditions become hotter & drier. No trackout, permit posted, silt fence perimeter installed in the direction of sheet flow and airport drainage system.
|
Permit Ready to Issue | | | 10/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit COM | | | 10/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 10/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2014 8:56AM
|