General Inspection | 10/16/2015 | 10/16/2015 | 10/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 10/16/2015 | 10/16/2015 | 10/16/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
General Inspection | 10/1/2015 | 10/1/2015 | 10/1/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/16/2015 | 9/16/2015 | 9/16/2015 | | PEND |
Evan Jenkins
|
|
|
re-veg of hydroseeded area (small area)
|
General Inspection | 9/1/2015 | 9/1/2015 | 9/1/2015 | | PEND |
Evan Jenkins
|
|
|
Disturbed areas are 90% revegetated via landscaping. A small portion of disturbed area along the South side of home has been hydroseeded. Waiting for 80% of revegetation before ESC permit will be finaled. No ESC issues observed
|
General Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PEND |
Evan Jenkins
|
|
|
Pending for 80% reveg
|
General Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 | | PEND |
Evan Jenkins
|
|
|
waiting on perm 80% re-vegetation
|
General Inspection | 6/16/2015 | 6/16/2015 | 6/16/2015 | | PEND |
Evan Jenkins
|
|
|
Minor WIP: Waiting for Perm Vegetation establishment to take effect
|
General Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Home near completion. Hillsides will need revegatation. No sediment leaving site. No spills or discharges observed. No corrections at this time.
|
General Inspection | 5/8/2015 | 5/8/2015 | 5/8/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues
|
General Inspection | 4/23/2015 | 4/23/2015 | 4/23/2015 | | PASS |
Andy J. Long
|
|
|
Frame complete. WIP on interior. No sediment leaving site. Trash contained and no discharges occuring. Approved.
|
General Inspection | 4/8/2015 | 4/8/2015 | 4/8/2015 | | PASS |
Andy J. Long
|
|
|
No sediment leaving site. Trash contained. Keeping within limits of construction. Approved
|
Random Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on interior and exterior finishes. Home foundation and frame are complete. No trackout or sediment runoff from site. Permit is posted with contact details.
Approved.
|
Random Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit posted, no trackout, trash contained. Workers parking on street and paved drive to stay off muddy areas. No corrections needed.
|
Issue & PRINT permit SFD | | | 11/3/2014 | | DONE |
|
|
|
|
Site Preparation | 10/28/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Andy J. Long
|
|
|
John 7943244
Site is ready for conitinued excavation. Wattles installed around basin inlet from previous Hackberry Ranch development project BMPs; wattle in trenched in at other potential discharge point. Driveway is already paved so trackout should be manageable. Permit posted. Discuss waste and washout standards with RP/GC John King and he agreed to use both.
Approved.
|
Site Preparation | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | CANC |
Evan Jenkins
|
|
|
John Phone #: ###-#### Contractor stated this Site Prep Inspection was supposed to be for the 29th. Data Entry Error
|
Permit Ready to Issue | | | 10/28/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit SFD | | | 10/28/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 10/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2014 6:05PM
|