Aging Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | | PASS |
Andy J. Long
|
|
|
Construction is complete and home occupied. Lot was not landscaped but has stabilized naturally with weeds and grasses. No sediment leaving. DI bag in front of house to remain as CBH finishes remainging parcels in Trailside Place II
|
DOC - Permit Finaled | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | FAIL |
Andy J. Long
|
|
|
Still need to remove inlet filter bag. Another request put into Brett at CBH to remove inlet. Site is clean and no sediment in gutter, but need to take out stormdrain inlets in Trailside Place II that are no longer necessary to catch construction site sediment.
|
Site Final | 3/12/2015 | 3/19/2015 | 3/19/2015 | P | PEND |
Andy J. Long
|
|
|
Check inlet bag removal...
Still need to remove inlet protection no longer needed. No other issues.
|
Site Final | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PART |
Andy J. Long
|
|
|
Home is complete and occupied with grass seed starting to grow.
Temp BMPs still installed, requested that CBH Homes remove the inlet protection bags on Cruzatte and Jump Creek next week.
|
Site Preparation | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Evan Jenkins
|
|
|
Brett Phone #: ###-#### Permit Posted, contractor to use existing onsite concrete washout and will sweep after each day.
|
Fees Due Hold | 10/25/2014 | | 11/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue & PRINT permit SFD | | | 10/24/2014 | | DONE |
|
|
|
|
Application received | | | 10/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2014 1:06PM
|