DOC - Permit Finaled | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and is for sale. Culdesac has been swept. ESC permit conditions satisfied.
|
Random Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | FAIL |
Andy J. Long
|
|
|
Trackout of mud to culdesac and sediment accumulation in gutter by concrete crew.
Verbal CN issued to RP Morgan of Hayden Homes to cleanup dirt with sweeping and remove collected dirt at the drop inlet.
He stated he will take care of it tomorrow.
|
Site Preparation | 10/24/2014 | 10/27/2014 | 10/27/2014 | A | PASS |
Andy J. Long
|
|
|
Permit posted with RP contact details. Work has not yet started. Occupied home adjacent to site. No offstreet contractor parking allowed. Washout pit for Sunnyridge projects is provided. Stormdrain on culdesac has inlet sediment bag; main BMP will be housekeeping.
|
Site Preparation | 10/24/2014 | 10/24/2014 | 10/24/2014 | P | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 10/27
|
Issue & PRINT permit SFD | | | 10/22/2014 | | DONE |
|
|
|
|
Application received | | | 10/9/2014 | | |
|
|
|
|