Site Final | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Temporary BMP DI bags down hill on Castello were removed as requested. ESC permit finaled.
|
Case Summary (ESC) | | | 5/19/2016 | | DONE |
|
|
|
|
General Inspection | 5/17/2016 | 5/17/2016 | 5/18/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/2/2016 | 5/2/2016 | 5/3/2016 | | PART |
Andy J. Long
|
|
|
Home construction complete and BLD finaled. Yard is landscaped and stabilized. All temp BMPs removed except for drop inlet sediment bags.
Need to remove bags to final ESC permit.
|
General Inspection | 4/15/2016 | 4/15/2016 | 4/15/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Yard and driveway not yet complete. Pool in progress as well. Most contractors parking on street, limited trackout. Down gradient DIs have sediment filter bags installed. Approved.
|
General Inspection | 3/16/2016 | 3/16/2016 | 3/17/2016 | | PASS |
Andy J. Long
|
|
|
WIP on large foothills mansion. No significant trackout, no discharges. MS4 inlets have sediment filters installed. No disturbance outside of limits of disturbance and surrounding vegetation has been preserved. No corrections at this time.
|
General Inspection | 3/1/2016 | 3/1/2016 | 3/1/2016 | | PASS |
Evan Jenkins
|
|
|
work in progress on interior and exterior. high viz fencing surrounding project no esc issues observed at this time
|
General Inspection | 2/15/2016 | 2/15/2016 | 2/16/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/29/2016 | 1/29/2016 | 1/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/14/2016 | 1/14/2016 | 1/14/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Numerous sub-contractor groups on site, all parking on street as instructed. No trackout, permit sign posted, and no viiolations observed.
|
General Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/30/2015 | 11/30/2015 | 11/30/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No earthwork occuring at this time. Some minor trackout from rock entrance should be swept and rock overturned. Permit sign is posted, downstream DIs have inlet filter bags installed. No erosion around site perimeter.
Note: significant amount of sediment runoff from the undeveloped lots across street from home on Castello unrelated to correction. Will lookinto having a wattle or silt fence installed by developer/lot owner to contain sediment.
|
General Inspection | 11/13/2015 | 11/13/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
Home construction in progress. No activity at time of inspection.
Permit sign is posted, new rock has been installed for stabilized entrance, and clearing limits and perimeter have been well kept. No offisite sediment runoff or erosion. Trash and materials are contained.
No violations, no corrections issued.
|
General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Clean site. No erosion or runoff issues observed.
|
General Inspection | 10/14/2015 | 10/14/2015 | 10/14/2015 | | PASS |
Andy J. Long
|
|
|
WIP on frame and interior. Construction entrance is in good condition with no trackout. Work has remained within clearing limits with perimeter vegetation preserved and sediment control wattle installed. Permit posted. Approved.
|
General Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | | PASS |
Andy J. Long
|
|
|
WIP on frame and interior. Workers parking on street. No trackout or discharges from site. NO corrections.
|
General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | | CANC |
Andy J. Long
|
|
|
WIP. No inspection conducted. No issues observed based on recent inspection of area/Castello. Site has had good compliance.
|
General Inspection | 8/28/2015 | 8/28/2015 | 8/28/2015 | | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit sign posted. Work and sediment staying within clearing limits. No trackout, construction entance installed. No corrections needed.
|
General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 | | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit sign posted. Construction entrance installed. No corrections needed at this time.
|
General Inspection | 7/24/2015 | 7/24/2015 | 7/24/2015 | | PASS |
Andy J. Long
|
|
|
Permit sign posted. RP on site, no trackout or discharges. Downslope wattle trapped sediment runoff but is in progress of having maintenance.
Lined concrete washout is being utilized and is well installed.
No corrections needed. Approved.
|
General Inspection | 7/9/2015 | 7/9/2015 | 7/9/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Contractors parking on street to avoid trackout. No hillside erosion observed. Permit is posted.
|
Random Inspection | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation and utility excavation. Perimeter controls installed as well as construction entrance. Permit clearly posted. No sediment leaving site, no discharges. Approved.
|
General Inspection | 6/16/2015 | 6/16/2015 | 6/16/2015 | | PASS |
Evan Jenkins
|
|
|
No issues observed at this time
|
Random Inspection | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs installed. RP onsite. No trackout. Very clean site despite recent rainfall events. No corrections.
|
General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Excavation for foundation is complete. No activity currently. Perimeter & downslope wattles are installed and trenched in. No trackout or discharges. Permit sign is posted.
|
Site Preparation | 5/6/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Andy J. Long
|
|
|
Nick Phone #: ###-####
Downslope perimeter wattles are trenched in. Contractor/RP replaced existing drop inlet bags on Castello with new filter bags. Old bags were extremely full. Will replenish/stabilize entrance to site after initial grading & grubbing. Permit posted. Approved.
Note: driveway apron and curbing was cracked prior to site work.
|
General Inspection | 4/23/2015 | 4/23/2015 | 4/24/2015 | | PASS |
Andy J. Long
|
|
|
No activity. New SFH in foothills has not started. Site prep inspection required prior to foundation excavation.
|
Permit Ready to Issue | | | 4/17/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/17/2015 | | DONE |
|
|
|
|
Application received | | | 10/24/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2014 2:37PM
|