Site Final | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 8/27/2015 | 8/27/2015 | 8/27/2015 | P | PASS |
Phil Shearer
|
|
|
|
General Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Back hillside has been left preserved. No erosion issues. Draco culdesac is free of sediment. No spills observed. Approved.
|
General Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
General Inspection | 5/13/2015 | 5/13/2015 | 5/13/2015 | | PASS |
Andy J. Long
|
|
|
Hillside home near completion. Construction and earthwork stayed well within limits of disturbance on parcel. Back slope native vegetation was kept in place. Draco culdesace is free of trackout and loose sediment. Approved.
|
General Inspection | 4/27/2015 | 4/27/2015 | 4/27/2015 | P | PASS |
Andy J. Long
|
|
|
Frame is complete. Hillside behind home is undisturbed with no erosion issues. No sediment leaving site, trash contained and culdesac is clean.
|
Random Inspection | 2/11/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Andy J. Long
|
|
|
Draco culdesac has been swept and workers are staying off the mud. Vegetated buffer has been preserved. No violations observed.
|
General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 | P | PART |
Andy J. Long
|
|
|
Correction needed: remove stockpile off sidewalk and provide perimeter sediment containment along the sidewalk in addition to stabilized entrance.
Permit posted. No sediment runoff down hill from site or hillside erosion occuring.
|
Site Preparation | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | PASS |
Andy J. Long
|
|
|
Eric Phone #: ###-####
Site is ready for excavation which will begin next week when conditions allow. Silt fence barriers are to be placed on the property of the two occupied adjacent lots after the hole is excavated (will be done in dry weather) and then stockpiles will be contained by the perimeter controls. Vegetative buffer on rear lot hillside will remain intact. DI protection provided in inlet, RP will monitor trackout.
|
Permit Ready to Issue | | | 11/19/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue & PRINT permit SFD | | | 11/19/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 10/31/2014 | | |
|
|
|
|
General Inspection | 6/16/2015 | 6/16/2015 | | | |
Dave Hannah
|
|
|
|