Site Final | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 5/15/2015 | 5/15/2015 | 5/15/2015 | | PASS |
Andy J. Long
|
|
|
WIP on East Valley Home. Near completion. Clean site, no trackout or sediment leaving site with runoff. Trash contained.
|
Site Preparation | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Permit is posted with contact details. BMPs provided include inlet protection, trash containment, lined concrete washout for East Valley, and administrative controls to prevent trackout and unauthorized driving on mud.
|
Issue & PRINT permit SFD | | | 11/28/2014 | | DONE |
|
|
|
|
Application received | | | 11/3/2014 | | |
|
|
|
|