Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 | | PASS |
Andy J. Long
|
|
|
All disturbed area during construction is now stabilized. Permeable pavers installed in parking lot. No temp BMPs remaining. ESC permit condtions satified. BLD open for minor corrections.
|
DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Andy J. Long
|
|
|
Project is near completion with several phases complete. No trackout or discharges observed. Permit posted. Approved.
|
Tracking Control | 3/21/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Andy J. Long
|
|
|
Follow up on correction request issued Monday 3/21
Trackout cleaned up
|
Aging Inspection | 3/21/2016 | 3/21/2016 | 3/21/2016 | | PART |
Andy J. Long
|
|
|
Request to clean up trackout in Boise Ave bike lane. RP stated he will have it swept up, but also stated he feels the trackout is from Dibble Excavation working on a BSU parcel.
Will check for cleanup later this week and follow with involved parties as necessary.
|
Aging Inspection | 1/18/2016 | 1/18/2016 | 1/19/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Site staging area and entrance is free of loose dirt or other materials. No trackout, no discharges offsite. No corrections issued.
|
Tracking Control | 11/18/2015 | 11/18/2015 | 11/19/2015 | P | PART |
Andy J. Long
|
|
|
No significant trackout occuring at time of inspection.
Correction request issued via phone to RP Buzz Baker to clean up the paved entrance area of loose mud and sediment. Suggested a designated parking area for workers in a clean area. RP will work on cleaning and organizing the staging area.
Will check pack next week.
|
Aging Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Materials and washout are contained on site. No discharges or trackout from site. No issues.
|
Conference | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Andy J. Long
|
|
|
conference to review BMPs for next phase requested by Buzz 4 PM
Existing asphalt entrance from Boise Avenue will remain. MS4 near entrance is above grade from site drainage area and is large crate. Sediment protection will be regular sweeping of the existing asphalt used as construction entrance. On site storm drains are to be demolished and replaced by permeable pavers in a later phase. During construction water ponds on site and infiltrates in the sandy material.
Approved. WIP. Provided new ESC permit sign, old one got wet/faded
Concrete washouts
|
Aging Inspection | 7/29/2015 | 7/29/2015 | 7/29/2015 | | PASS |
Evan Jenkins
|
|
|
Structure near completion: WIP: funning plumming from Boise Ave. Trenching occuring. Few minor stockpiles in vacant lot. No discharge at this time
|
Aging Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Evan Jenkins
|
|
|
Buzz Phone #: ###-#### Permit Posted along East Side Chainlink Fence next to project. Concrete washout is an Outpack washout. Lot is flat. No esc issues at this time
|
Permit Ready to Issue | | | 12/11/2014 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 12/11/2014 | | DONE |
|
|
|
|
Application received | | | 11/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 5 2014 5:03PM
|