General Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | DONE |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 9/30/2015 | 9/30/2015 | 9/30/2015 | P | PASS |
Evan Jenkins
|
|
|
ESC Conditions Satisfied
|
General Inspection | 8/14/2015 | 8/14/2015 | 8/14/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
General Inspection | 5/13/2015 | 5/13/2015 | 5/13/2015 | | PASS |
Evan Jenkins
|
|
|
Interior WIP: No ESC issues at this time
|
Site Preparation | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PART |
Evan Jenkins
|
|
|
Brian Phone #: ###-#### Drop Inlets protected, but contractor stated he wasnt given a yellow permit sign. He will pick one up tomorrow and get it posted. no other esc issues at this time
|
Issue & PRINT permit SFD | | | 12/9/2014 | | DONE |
|
|
|
|
Application received | | | 11/10/2014 | | |
|
|
|
|
Routing - Erosion and Sediment | 11/10/2014 | | 11/10/2014 | | DONE |
Evan Jenkins
|
|
|
Permit to excavate, grade and pave a new drive through. Scope of work includes installation of grease interceptor, sidewalk improvements. Work is to be done according to engineered plans on file as approved by Public Works. Install curbing and striping as noted on the plans. Reference DRH14-00359
|