Site Final | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Andy J. Long
|
|
|
Bobby Phone #: ###-####
Permit posted. Lot is ready for construction.
Need to designate a construction entrance area to prevent trackout.
No stormdrain in vicinity and flat terrain, will just need to keep up on housekeeping and sweeping sidewalks.
|
Issue & PRINT permit SFD | | | 12/17/2014 | | DONE |
|
|
|
|
Application received | | | 12/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 11 2014 9:21AM
|