General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 | | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Hillside bond issues for revegetation/stabilization. No erosion observed, no sediment leaving parcel.
|
DOC - Permit Finaled | 1/7/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/23/2015 | 12/23/2015 | 12/23/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/8/2015 | 12/8/2015 | 12/8/2015 | | PASS |
Andy J. Long
|
|
|
revegetation of disturbed slopes in progress. No issues.
|
General Inspection | 11/23/2015 | 11/23/2015 | 11/23/2015 | | PASS |
Andy J. Long
|
|
|
Home construction is complete. Slopes with yard have been hydroseeded, but vegetation is not yet establish and site not yet stabilzed. No sediment leaving site and materials and loose dirt have been swept off of sidewalk & street.
|
General Inspection | 11/6/2015 | 11/6/2015 | 11/6/2015 | | PEND |
Evan Jenkins
|
|
|
Perm re-veg
|
General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 | | PASS |
Andy J. Long
|
|
|
Home complete, BLD finaled. Final landscaping and revegetation on hillside in progress.
|
General Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 | | PASS |
Andy J. Long
|
|
|
WIP on landscaping and driveway. Will need sweep of materials temporarily stored there.
Construction on interior and exterior home complete. No discharges or hillside erosion issues observed.
|
General Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | | PASS |
Andy J. Long
|
|
|
Home near completion. No trackout, no sediment runoff to Toluka or Hard Rock (below). Yard not yet landscaped. No trash or dust issues.
|
General Inspection | 9/7/2015 | 9/7/2015 | 9/8/2015 | | CANC |
Andy J. Long
|
|
|
holiday
|
General Inspection | 8/21/2015 | 8/21/2015 | 8/21/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Home near completion. Yard not yet landscaped or stabilized. Street and sidewalk in front of home are clean. No corrections at this time.
|
Site Preparation | 7/21/2015 | 7/22/2015 | 7/22/2015 | A | CANC |
Andy J. Long
|
|
|
need to complete site prep and BMP installation.
Data entry error. Disregard.
|
General Inspection | 7/10/2015 | 7/10/2015 | 7/10/2015 | | PASS |
Andy J. Long
|
|
|
No sediment leaving site. Street and sidewalk free of trackout. Some rill erosion within area of disturbance will need repairs, part of issue is that roof top gutters and downspouts are not yet installed. No sediment runoff to Hard Rock
|
General Inspection | 6/24/2015 | 6/24/2015 | 6/24/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Exterior and Interior work occuring. No ESC issues observed at this time of inspection
|
General Inspection | 6/2/2015 | 6/2/2015 | 6/2/2015 | | CANC |
Evan Jenkins
|
|
|
|
Random Inspection | 3/5/2015 | 3/5/2015 | 3/5/2015 | P | PART |
Andy J. Long
|
|
|
Street,sidewalk and gutter in front project has been recently swept. Some minor accumulations of loose sediment still remain.
Corrections: 1. Need to clean up concrete washout pile, No washout containment was used 2. Re-install silt fence at downhill property line or use a wattle. 3. Put trash in a container bin
|
Random Inspection | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PART |
Andy J. Long
|
|
|
Limits of disturbance and silt fence perimeter are in good condition.
Now that conditions have dried out, need to sweep the street and parking areas where workers are parking and unloading. Lots of loose sediment.
|
Complaint Inspection | 1/23/2015 | 1/23/2015 | 1/23/2015 | A | PART |
Andy J. Long
|
|
|
Limited space on this hillside lot so foundation material being infilled has been temporarily stockpiled on Toluka as stated in complaint.
Verbal CN issued to onsite supervisor from SC construction to sweep up completely.
CN also issued to RP Eric to make sure the sweeping is better than it was yesterday and to fix /reinstall portion of downslope silt fence that has been untrenched.
No spills or discharges of dirty occuring; permit posted. Workers and RP responsive to C
|
Site Preparation | 1/13/2015 | 1/13/2015 | 1/13/2015 | P | PART |
Andy J. Long
|
|
|
Eric Phone #: ###-####
Need to post ESC permit number and contact information.
The silt fence is not trenched in properly in some areas and may not be necessary below the boulders. The area that is trenched in is the sheet flow direction.
Approved to excavate - CN to post permit, sweep sidewalk after hole is dug.
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/12/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 1/12/2015 | | DONE |
|
|
|
|
Application received | | | 12/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2014 11:01AM
|