Aging Inspection | 9/1/2015 | 9/1/2015 | 9/1/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. No sediment leaving site from cell tower. Area to the east was disturbed under demo on ESC14-01142. Lot is below grade of all surrounding hard surfaces and the rail road track. Some weed have vegetated. Area being used by apartment residents as turnaround area. No further ESC inspections necessary
|
DOC - Permit Finaled | 9/1/2015 | 9/1/2015 | 9/1/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | | PEND |
Evan Jenkins
|
|
|
Disturbed areas to the East of project needs to be re-established with vegetation. Permit still posted.
|
Random Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PEND |
Andy J. Long
|
|
|
Cell tower is complete and appears to be operational. Need to clean up site and remove permit and miscellaneous materials. No trackout or sediment leaving site. Tractor & trailer still here...BLD open
|
Site Preparation | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Andy J. Long
|
|
|
Josh Phone #: ###-####
Permit posted. Heavy rock tracking pad installed for heavy equipment that is preparing foundation. Approved to continue project. No MS4 or private stormwater facilities to protect. Just need to sweep up any trackout.
|
Permit Ready to Issue | | | 1/26/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/26/2015 | | DONE |
|
|
|
|
Application received | | | 12/16/2014 | | |
|
|
|
|