General Inspection | 6/30/2016 | 6/30/2016 | 6/30/2016 | | DONE |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied This portion to the project is complete. Main park is still under ESC conditions to reach 70% re-veg
|
General Inspection | 6/15/2016 | 6/15/2016 | 6/15/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Final landscaping and park feature installation & clean up occuring.
|
General Inspection | 5/31/2016 | 5/31/2016 | 5/31/2016 | | PEND |
Evan Jenkins
|
|
|
construction complete. pending perm re-veg. No ESC issues observed
|
General Inspection | 5/16/2016 | 5/16/2016 | 5/16/2016 | | PASS |
Evan Jenkins
|
|
|
Intake work complete waiting for re-vegetation prior to finaling out ESC Permit
|
General Inspection | 4/29/2016 | 4/29/2016 | 4/29/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for tuesday 5/3
|
General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | PEND |
Evan Jenkins
|
|
|
Construction Complete Pending re-veg
|
General Inspection | 3/15/2016 | 3/15/2016 | 3/16/2016 | | PASS |
Andy J. Long
|
|
|
Canal intake structure is complete. Disturbed areas around intake have been hydroseeded. No corrections associated with this phase. See also ESC15-00306
|
General Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 | | PASS |
Evan Jenkins
|
|
|
|
Conference | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Andy J. Long
|
|
|
Met with Boise Public Works project manager Rob to view the recently completed canal intake. No turbidity source in the River observed. Bank and has been stabilized with large boulders.
Topsoil was applied this week. Hydroseeding and tacifier to be applied next week around the intake and in between the new Greenbelt path and Veteran's Pond.
Will come view the hydroseeding application next week. No corrections issued at this time.
|
General Inspection | 2/11/2016 | 2/11/2016 | 2/11/2016 | | PEND |
Evan Jenkins
|
|
|
Coffer dam has been removed. Construction on new wier gates complete. Awaiting perm re-vegetation to take place this spring
|
General Inspection | 1/27/2016 | 1/27/2016 | 1/27/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/12/2016 | 1/12/2016 | 1/12/2016 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection. No discharges leaving site at this time. no ESC issues observed
|
General Inspection | 12/28/2015 | 12/28/2015 | 12/28/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No discharges entering boise river, or other esc issues observed
|
General Inspection | 11/26/2015 | 11/26/2015 | 11/27/2015 | | PASS |
Andy J. Long
|
|
|
WIP on canal culvert installation at Esther Simplot Park. No activity at time of inspection. No trackout from site, no issues regarding coffer dam structure. No trackout or discharges offsite. No corrections.
|
General Inspection | 11/11/2015 | 11/11/2015 | 11/12/2015 | | PASS |
Evan Jenkins
|
|
|
WIP on canal intake. No issues observed at this time
|
Complaint Inspection | 10/27/2015 | 10/27/2015 | 10/28/2015 | P | PASS |
Andy J. Long
|
|
|
Plume reported in Boise River Tuesday 10/27. Site inspection conducted at 4 PM. Investigated site with SWPPP coordinator for McMillen- Jacobs ACHD SWPPP Inspector.
Leak from river was going through cofferdam structure blocking off area of box culvert location, filling the area of work with water. To stop the leak the exterior lining on the dam was extended and more earth material added to the dam, which caused some turbid discharges of sediment down river during the activity. Turbidity was meaurred and is reported in the SWPPP daily report. SWPPP coordinator stated the turbidity did not reach reportable levels.
Inspection of the area of concern did not reveal any active plumes into Boise River and no BMP failures were identified. The rest of the site is in good condition, trackout and perimeter controls are working well. Dewatering system is still treating water passing through site and ground water being pumped.
No corrections. Site has fixed problem and has reported the corrective action.
|
General Inspection | 10/20/2015 | 10/20/2015 | 10/20/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues observed at this time. Inspection took place at 12:00pm
|
General Inspection | 10/5/2015 | 10/5/2015 | 10/5/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: BMP's in place. No ESC issues observed at this time
|
General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 | | PEND |
Evan Jenkins
|
|
|
Hasn't started yet
|
General Inspection | 9/3/2015 | 9/3/2015 | 9/3/2015 | | PEND |
Evan Jenkins
|
|
|
Project has not begun yet
|
General Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | | NR |
Evan Jenkins
|
|
|
Olivia stated this portion of the project has been put on hold for approximately one more month. No work is occuring at this time.
|
General Inspection | 8/4/2015 | 8/4/2015 | 8/4/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/3/2015 | 7/3/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
No offhauling currently. Still in proecess of excavating old pond area to dig new pond. No dust issues or trackout observed. No activity directly next to River corridor. No corrections at this time. Full walk through needs to be scheduled.
|
Aging Inspection | 6/12/2015 | 6/12/2015 | 6/12/2015 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Andy J. Long
|
|
|
Limited activity at time of inspection. Got report that there was a muddy discharge downstream from Farmer Union intake area.
After further investigation it is clear that the turbid flow is coming from Crane Creek, not from this project.
|
General Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Andy J. Long
|
|
|
Staging areas and initial BMPs have been installed for Phase II of Esther Simplot. No excavation activity at site yet. No corrections needed at this time.
|
Site Preparation | 1/15/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Evan Jenkins
|
|
|
Silt Fence is installed correctly in two locations. McMillen placed large construction access rock throughout the entire haul road to minimize trackout as much as possible. Permit is posted w/ SWPPP onsite. As the project advances, they will install more BMP's as they go. No esc issues
|
Site Preparation | 1/12/2015 | 1/16/2015 | 1/15/2015 | A | CANC |
Evan Jenkins
|
|
|
Greg Phone #: ###-#### McMillen & Parks and Rec were not ready for initial schedualed Site prep for morning inspection. Reschedualed for PM. EEJ
|
Routing - Erosion and Sediment | 1/9/2015 | | 1/12/2015 | | DONE |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED PRIOR TO EARTH DISTURBANCE):
Intake Modifications: Part of the Esther Simplot Park/Whitewater Park Development.Intake and installation of 400ft of culvert in canal. Installation of a Reinforced concrete intake, large box culvert and cast-in-place concrete control gate.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2015 | | |
|
|
|
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/12/2015 | | DONE |
Candy A. Nichols
|
|
|
appeal date has passed
|
Telephone call | | | 1/12/2015 | | DONE |
Candy A. Nichols
|
|
|
called Olivia to let know permit is ready and how much is owed-left message on her phone
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 1/12/2015 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/12/2015 | | |
|
|
|
|
Issue & PRINT permit COM | | | 1/12/2015 | | DONE |
|
|
|
|
Application received | | | 1/9/2015 | | |
|
|
|
|