Site Final | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 6/19/2015 | 6/19/2015 | 6/19/2015 | | PASS |
Andy J. Long
|
|
|
Near completion. Some housekeeping required before permit final. No sediment leaving site at time of inspection. Approved.
|
Site Preparation | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | PASS |
Andy J. Long
|
|
|
Chris Phone #: ###-####
Onsite meeting with RP/GC Chris of Hornet Construction. Asphalt to be cut between power poles. Sheet flow goes to grassy vegetated area. No MS4 infrastructure on Gem Street. Home will be moved and then set down next to where foundation will be excavated.
Permit will be posted in the window on the house. Approved for construction
|
Issue & PRINT permit SFD | | | 1/21/2015 | | DONE |
|
|
|
|
Application received | | | 1/15/2015 | | |
|
|
|
|