Site Final | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Andy J. Long
|
|
|
Site was stabilized with a temporary tackifier mulch matrix product by N. American Dust Control. No issues at site. BLD and bond released. Permit removed. Application for new parking lot will be submitted to City later this month
|
Random Inspection | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PEND |
Andy J. Long
|
|
|
Motel has been demolished and all debris hauled away. No activity at site, chain link fencing still installed. Motel footprint is dirt graded flat within asphalt parking lot. No sediment runoff or trackout from area. BLD permit open pending stabilization plan.
Discussed with IDS RP Seth and he stated St. Al's and engineer are working on plan. Permits still open and bond not yet released. Will continue to monitor. Permit sign posted.
|
Permit Ready to Issue | | | 2/4/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/4/2015 | | DONE |
|
|
|
|
Application received | | | 1/30/2015 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/30/2015 | | 1/30/2015 | | DONE |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED)
Demo-Commercial: Project involves Asbestos abatement work, demolition of the commercial buildings, cleanup and disposal of debris, and grading for future pavement parking lot.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2015 | | |
|
|
|
|