Site Final | 7/29/2015 | 7/29/2015 | 7/29/2015 | P | PASS |
Andy J. Long
|
|
|
All temp BMPs are now removed as requested. Permit conditions satisfied.
|
Aging Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 | | FAIL |
Andy J. Long
|
|
|
Temp BMP (DI bag) still installed on MS4 storm drain on Overland. Needs to be removed. Final warning issued to RP for PC Maintenance to remove.
|
Site Final | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PART |
Andy J. Long
|
|
|
Construction complete and site has been cleaned and is open for business.
Corrections needed to final permit: 1. Remove DI bag on MS4 on Overland west of entrance. 2. Remove or stake down wattles lining the irrigation ditch.
Corrections issued to RP Lach. Will check back. No violations or discharges at site.
|
Random Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | A | PASS |
Andy J. Long
|
|
|
WIP on TI and site improvements at old fire station. No trackout, dust, or runoff occuring. Permit is posted, BMPs installed. Approved.
|
Issue & PRINT permit COM | | | 2/26/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 2/9/2015 | | DONE |
Christina Prado
|
|
|
Called Office to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 2/9/2015 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 2/5/2015 | | 2/6/2015 | | DONE |
Evan Jenkins
|
|
|
(SITE PREP INSPECTION REQUIRED)
Commercial Remodel/Addition Involving Grading. This is a different phase than current work occuring onsite. Additionally to construct all associated site and roadway frontage improvements for the use of the rental shop as shown on the site construction maps.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2015 | | |
|
|
|
|
Application received | | | 2/5/2015 | | |
|
|
|
|