General Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. BLD finaled. Yard is in process of being landscaping by homeowner. No temp BMP removal needed on site. ESC permit finaled.
|
DOC - Permit Finaled | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/22/2015 | 12/22/2015 | 12/22/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/18/2015 | 9/18/2015 | 9/18/2015 | | PART |
Andy J. Long
|
|
|
WIP. Home structure is up, driveway not paved so large muddy puddle at entrance. No activity at site and no trackout.
Correction: - empty full trash container to prevent mixing with stormwater management and wind blowing light materials off site.
-
|
General Inspection | 8/3/2015 | 8/3/2015 | 8/3/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. No significant trackout or discharges. No corrections at this time.
|
Site Preparation | 5/4/2015 | 5/4/2015 | 5/4/2015 | P | PASS |
Andy J. Long
|
|
|
Warren Phone #: ###-####
Permit posted. Excavation to begin later this week. Wattle is installed along the west limit of disturbance to protect irrigation ditch. Banks and rock walls to be preserved as well as trees & shrubs along the north (Dundee Street side)
Contractor stated that excavator will install stabilized rock construction entrance as part of their scope of work. Approved.
|
Permit Ready to Issue | | | 4/28/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/28/2015 | | DONE |
|
|
|
|
Application received | | | 2/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2015 4:29PM
|