General Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 4/13/2015 | 4/13/2015 | 4/13/2015 | P | PASS |
Evan Jenkins
|
|
|
This portion is complete. Other Remaining ESC Permits issued are: ESC15-00306 (for Grading), and ESC15-00302 (Head Gate Mods on the Canal).
|
Site Preparation | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | PASS |
Evan Jenkins
|
|
|
All BMP's in place, very impressive construction entrance as well. This site prep was supposed to be for the ESC Permit attached to the GRD15-00006. Permits posted. Site is in great shape. Stockpiles nearly completely removed
|
(F) Reprint permit | | | 3/20/2015 | | DONE |
|
|
|
|
Fees Due Hold | 2/20/2015 | | 3/20/2015 | | DONE |
Brittany Hill
|
|
|
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PASS |
Andy J. Long
|
|
|
WIP - perimeter security fence and initial site BMPs are installed. Fees due hold listed, but ESC may be paid under ESC15-00302 (which is attached to BLD15-00802 permit for park construction). Boise Parks n Rec was going to be billed per McMillan.
|
Application received | | | 2/19/2015 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/19/2015 | | 2/19/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver with site map, project description, and site photos submitted and approved. All future Esther Simplot Projects shall reference this permit # for area of disturbance fee paid up front with this permit. Future ESC plans or SWPPP documents shall be submitted for review and documented under this permit. Approved for site clearing/site prepartion construction activities.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/19/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/19/2015 | | DONE |
|
|
|
|