Site Final | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Andy J. Long
|
|
|
All construction and site improvements complete. Temp BMP DI bags on Orchard and Overland have been removed. ESC permit conditions satisfied. Primary Health on Overland now occupied and open for business.
|
General Inspection | 9/29/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Rex Boyles
|
|
|
final ok all erosion control guidelines met landscaping completed
|
Aging Inspection | 9/2/2015 | 9/2/2015 | 9/2/2015 | | PASS |
Andy J. Long
|
|
|
WIP on overland Primary Care. No violations observed. Permit sign posted.
|
Random Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Andy J. Long
|
|
|
Old building (Radean's) has been demolished. Project is now in new vertical phase and walls and monument signs covered under ESC15-00768.
No trackout or discharges, no fugitive dust or other issues observed.
|
Site Preparation | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Andy J. Long
|
|
|
Initial site prep was conducted for the demolition of the old building. CM company requested second site prep because they are starting now on the Primary Health Clinic.
Permiter wattles installed. Concrete washout "eco-pans" are onsite and being utilized. MS4 DIs on Overland and Orchard have inlet protection. Approved
|
Site Preparation | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | PASS |
Andy J. Long
|
|
|
Work on demolition has started. Drop inlets on Orchard and Overland have filter protection. Water truck on site to control dust.
Approved.
|
Permit Ready to Issue | | | 3/25/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 3/25/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/24/2015 | | 3/24/2015 | | PASS |
Andy J. Long
|
|
|
Ideal Demolition demolition work (BLD15-00850) to be covered under this permit in addition to new building construction
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2015 | | DONE |
|
|
|
|
Application received | | | 3/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 4 2015 12:17PM
|