Aging Inspection | 10/30/2017 | 10/30/2017 | 10/30/2017 | | CANC |
Andy J. Long
|
|
|
NO activity or operator at project. No runoff issues at site. No futher inspections.
|
DOC - Permit Finaled | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 6/26/2017 | 6/26/2017 | 6/27/2017 | | PEND |
Melissa Jannusch
|
|
|
Need to remove silt fence.
|
Aging Inspection | 4/24/2017 | 4/24/2017 | 4/24/2017 | | PEND |
Melissa Jannusch
|
|
|
Remove termporary BMPs.
|
Aging Inspection | 2/20/2017 | 2/20/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
Holiday
|
Aging Inspection | 12/19/2016 | 12/19/2016 | 12/19/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | | FAIL |
Evan Jenkins
|
|
|
remove temp BMP's (Silt Fence)
|
Aging Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | FAIL |
Evan Jenkins
|
|
|
Remove Temp BMP's
|
Aging Inspection | 4/11/2016 | 4/11/2016 | 4/11/2016 | | PEND |
Evan Jenkins
|
|
|
project complete remove temp bmp's
|
Aging Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 12/7/2015 | 12/7/2015 | 12/7/2015 | | PEND |
Evan Jenkins
|
|
|
No activity at time of inspection. Temp BMP's need to be removed along with Yellow Permit Signage. Re-vegetation near complete. No ESC issues observed at time of inspection
|
General Inspection | 10/6/2015 | 10/15/2015 | 10/14/2015 | A | CANC |
Andy J. Long
|
|
|
data entry error
|
Aging Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | | PASS |
Andy J. Long
|
|
|
Temp BMPs installed, revegetation in progress. No corrections at this time.
|
Aging Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 | | PEND |
Evan Jenkins
|
|
|
Establishment of vegetation slowly taking place.
|
Site Preparation | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Evan Jenkins
|
|
|
Troy Phone #: ###-#### Permit Posted on front doors, but will be moved to a post in front of the Bomb Shelter. Met with Troy to discuss location to place silt fence along curling Dr. will be done today
|
Issue & PRINT permit COM | | | 3/12/2015 | | DONE |
|
|
|
|
Application received | | | 3/11/2015 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/11/2015 | | 3/11/2015 | | DONE |
Evan Jenkins
|
|
|
The removal of dirt to expose the roof for repairs, and would like to incorporate the soil from into the existing earth surrounding the building. Work consists of relocating the soil from the top of the building to the side and surrounding the bottom. BMP's include installation of silt fence along the sidewalk closest to the work area.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2015 | | |
|
|
|
|
Telephone call | | | 3/11/2015 | | DONE |
|
|
|
called Troy- told him permit is ready for pick up and fees due
|
Permit Ready to Issue | | | 3/11/2015 | | DONE |
|
|
|
Fees due- give Troy Responsible person information
|