Site Final | 9/9/2015 | 9/9/2015 | 9/9/2015 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/9/2015 | 9/9/2015 | 9/9/2015 | P | PASS |
Dave Hannah
|
|
|
|
Aging Inspection | 8/26/2015 | 8/26/2015 | 8/26/2015 | | PASS |
Andy J. Long
|
|
|
Home is near completion with some interior work ongoing. Yard is landscaped and streets cleaned. No temp BMPs to remove. No further ESC inspections, permit conditions met.
|
Site Preparation | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Andy J. Long
|
|
|
Brandon Phone #: ###-####
Flat lot, designated washout in subdivision development. RP/GC Brandon familiar with ESC permit conditions.
Permit posted. Approved for excavation.
|
Permit Ready to Issue | | | 3/30/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/30/2015 | | DONE |
|
|
|
|
Application received | | | 3/12/2015 | | |
|
|
|
|