General Inspection | 11/24/2015 | 11/24/2015 | 11/25/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete for parking lot resurfacing, access addition, and retaining wall. No materials or loose sediment. No temp BMPs in area.
|
DOC - Permit Finaled | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 | | PASS |
Evan Jenkins
|
|
|
WIP
|
General Inspection | 10/7/2015 | 10/7/2015 | 10/7/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/22/2015 | 9/22/2015 | 9/22/2015 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Andy J. Long
|
|
|
9:30 AM site prep requested by Lach
ESC site prep meeting and walk through conducted with PC maintenance.
Work area contained within parking lot. Sandbag check bags will be installed on the gutter on Collister (east branch) to capture any sediment or dirt. Dirt is mostly sand and pit run rock so will not easily transport.
Work to be completed next week. Permit posted. Trash container for employees to be provided. Approved for work.
|
Site Preparation | 5/20/2015 | 5/22/2015 | 5/21/2015 | A | CANC |
Evan Jenkins
|
|
|
Dan Phone #: ###-####
Dan contacted me via cellphone today 5-21-15. He asked questions pertaining to what is expected during the Site Prep Inspection. i disclosed to him the requirements. He stated he would not be ready tomorrow, and will reschedual soon.
|
Permit Ready to Issue | | | 5/1/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 5/1/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/1/2015 | | DONE |
|
|
|
|
Application received | | | 3/24/2015 | | |
|
|
|
|