Case Summary (ESC) | | | 8/26/2016 | | DONE |
|
|
|
|
DOC - Permit Finaled | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Andy J. Long
|
|
|
Sun Valley Express bus yard & warehouse is occupied. No temp BMPs remain on site, ESC permit conditions satisfied.
|
General Inspection | 2/26/2016 | 2/26/2016 | 2/26/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | | PASS |
Andy J. Long
|
|
|
Project near completion. Sun Valley stage has temp. occupancy. Some trackout from bus lot is occruing. Adjacent projects by Ekberg Construction in industrial area also in progress. No corrections at this time.
|
General Inspection | 11/24/2015 | 11/24/2015 | 11/24/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/8/2015 | 10/8/2015 | 10/8/2015 | | PASS |
Andy J. Long
|
|
|
WIP on bus warehouse and maintenance structure. Permit sign posted, no trackout to Targhee. Multiple projects ongoing in Targhee industrial area, no issues observed. No complaints received.
|
General Inspection | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. Construction entrance installed and permit sign posted.
Located in flat industrial park with topography that drains runoff inward. No wind blown trash or trackout.
No corrections at this time.
|
Issue & PRINT permit COM | | | 6/26/2015 | | DONE |
|
|
|
|
Application received | | | 3/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2015 8:41AM
|