General Inspection | 5/16/2016 | 5/16/2016 | 5/16/2016 | | PASS |
Andy J. Long
|
|
|
Disturbed area on parcel has revegetated enough to satisfiy ESC permit conditons. Home is occupied, no construction, no materials or sediment running off site. Hillside vegetation/stabilization bond issued.
No further ESC inspections.
|
DOC - Permit Finaled | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/29/2016 | 4/29/2016 | 4/29/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/14/2016 | 4/14/2016 | 4/14/2016 | | PEND |
Andy J. Long
|
|
|
Home complete. Site is over 70% vegetated. No sediment leaving site.
Hillside bond issued for stabilzation/ revegetation. Small rill from rooftop runoff should be addressed to prevent future discharges or sediment runoff to Wind Dancer.
|
General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/15/2016 | 3/15/2016 | 3/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 | | PASS |
Andy J. Long
|
|
|
revegetation phase. No construction, no corrections at this time.
|
General Inspection | 2/12/2016 | 2/12/2016 | 2/12/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | | PEND |
Andy J. Long
|
|
|
Home complete and occupied. Disturbed hillside areas in process of revegetating. Will monitor hydroseeded area off Wind Dancer. No issues at this time.
|
General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | | PASS |
Andy J. Long
|
|
|
Home is complete with BLD finaled and hillside vegetation and stabilization bond issued.
Will conltinue to monitor hydroseeded area and drainage area below home toward Wind Dancer, an erosion rill is identifiable but no sediment leaving site.
|
General Inspection | 12/29/2015 | 12/29/2015 | 12/29/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 | | PASS |
Andy J. Long
|
|
|
Home construction is complete. Adajacent home next door is in progress and has construction rock entrance provided. No significant trackoout.
Site just had revegetation bond issued by PW Hillside review. No corrections at this time. Will monitor landscaping and revegetation. Much of existing vegetation was preserved.
|
General Inspection | 11/27/2015 | 11/27/2015 | 11/27/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/11/2015 | 11/11/2015 | 11/12/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No hillside erosion or trash issues. Shared driveway with adjacent active project ESC15-00509 has trackout due to employee parking at that site.
Working with both contractors to sweep culdesac and take administrative controls (designated parking) to prevent trackout.
|
General Inspection | 10/27/2015 | 10/27/2015 | 10/27/2015 | | PASS |
Andy J. Long
|
|
|
Home is near completion with some interior work ongoing. Vegetative perimeter has been preserved and boulders left in place, keeping surrounding area quite stable. No erosion rills or gullies observed, no trackout or trash issues at entrance.
|
General Inspection | 10/9/2015 | 10/9/2015 | 10/9/2015 | | PASS |
Andy J. Long
|
|
|
WIP on exterior and interior finishes. Earth work and frame are complete. No sediment trackout or runoff. Native vegetation around clearing limits has been preserved. Will need to stabilize area used for loading & parking off of Wind Dancer before final ESC inspection.
|
General Inspection | 9/24/2015 | 9/24/2015 | 9/24/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 9/9/2015 | 9/9/2015 | 9/10/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 | P | PASS |
Andy J. Long
|
|
|
Permit posted. Construction entrance installed, and straw wattle placed below recently installed retaining wall. No violations occuring at site. Hillside vegetation and rock outcrops on site are to be left for "natural" landscaping.
|
Site Preparation | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Andy J. Long
|
|
|
Brian Phone #: ###-####
Site walk through conducted with GC and RP. Initial site excavation of some boulders is permitted under grading permit. Site is large with many boulders that will remain onsite. Large acre parcel, main BMP will be maintaining the natural vegetaion as a buffer, whihc is the plan.
A common driveway will be constructed off of Ridge Point and will serve as the vehicle tracking pad/construction entrance once home building commences.
Permit is posted. Approved to begin work
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/2/2015 | | DONE |
|
|
|
|
Application received | | | 3/31/2015 | | |
|
|
|
|