Site Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Andy J. Long
|
|
|
Permit finaled. Sand bag BMP and captured sediment has been cleaned up as requested. ESC permit conditions satisfied.
|
Aging Inspection | 9/23/2015 | 9/23/2015 | 9/23/2015 | | PART |
Andy J. Long
|
|
|
Home construction complete, no further earth work. Yard is landscaped/stabilized.
Correction needed to final permit:
- remove sand bag used for sediment control, sweep up loose sand and sediment in the gutter.
Called RP-homeowner Kyle and left VM. Will wait for response to re-inspect.
|
Site Preparation | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Andy J. Long
|
|
|
Kyle Phone #: ###-####
Meet GC on site. Excavation to start later today. Permit posted. Will place sandbag in gutter at angle to trap sediment from site. Low traffic street. Existing vegetation along curb will be preserved. Approved for construction.
|
Permit Ready to Issue | | | 4/9/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/9/2015 | | DONE |
|
|
|
|
Application received | | | 4/7/2015 | | |
|
|
|
|