DOC - Permit Finaled | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Andy J. Long
|
|
|
ESC inspection activity covered under main site permit for Kensington, see ESC15-00504. This is a no fee permit
|
General Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PASS |
Evan Jenkins
|
|
|
work is in progress. no esc issues observed at this time
|
General Inspection | 7/13/2016 | 7/13/2016 | 7/13/2016 | | PASS |
Evan Jenkins
|
|
|
Work Continues. Majority of internal roads, sidewalks, curbs are poured and paved. No trackout of other ESC issues observed at this time.
|
General Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | | PASS |
Evan Jenkins
|
|
|
Majority of internal roads paved and sidewalks poured. WIP: no ESC issues observed at this time.
|
General Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/27/2016 | 5/27/2016 | 5/27/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/12/2016 | 5/12/2016 | 5/12/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 | | PASS |
Evan Jenkins
|
|
|
Saxton Dr. has been swept since Friday's issues. WIP: no issues ovbserved at this time
|
General Inspection | 3/11/2016 | 3/11/2016 | 3/11/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/25/2016 | 2/25/2016 | 2/25/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 2/10/2016 | 2/10/2016 | 2/10/2016 | | PART |
Andy J. Long
|
|
|
Need to sweep shoulders of road on Gary and control access to site from the Saxton entrances.
Going to site walk through inspection tomorrow.
|
General Inspection | 1/26/2016 | 1/26/2016 | 1/26/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No violations at time of inspection.
|
General Inspection | 1/11/2016 | 1/11/2016 | 1/12/2016 | | PART |
Evan Jenkins
|
|
|
Trackout noto Saxton needs swept
|
General Inspection | 12/25/2015 | 12/25/2015 | 12/28/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/10/2015 | 12/10/2015 | 12/10/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | | PASS |
Andy J. Long
|
|
|
Approved for construction. Concrete to be poured weather permitting next week. Central designated concrete washouts provided. RP Barry with Bach Homes will add angular rock to construction entrance(s). DI bags on Gary and Saxton are installed. Will install additional control on south side of Saxton . Approved. See also main site ESC permit ESC15-00504. 6 of the individual building unit ESC permits are now issued. There is a total of 31.
|
General Inspection | 11/10/2015 | 11/10/2015 | 11/10/2015 | | PASS |
Evan Jenkins
|
|
|
Grading still occuring at this time. Did not see any ESC violations during inspection.
|
Permit Ready to Issue | | | 11/2/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/2/2015 | | DONE |
|
|
|
|
Application received | | | 4/9/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2015 3:20PM
|