DOC - Permit Finaled | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Andy J. Long
|
|
|
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
|
General Inspection | 3/18/2016 | 3/18/2016 | 3/18/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 2/1/2016 | 2/1/2016 | 2/1/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. All DIs (MS4 & new private) have sediment bag protection. No significant trackout from site entrances. Concrete washout was utilized. Permit signs posted at job trailer. No corrections issued at this time. Will need to make sure temp BMPs are removed from MS4 inlets on Overland, Goldking, and Cable Car.
|
General Inspection | 11/4/2015 | 11/4/2015 | 11/4/2015 | | PASS |
Andy J. Long
|
|
|
WiP on Union Square retail building. Silt fence sediment control installed along Overland, parking lot/access drive is not asphalt so no trackout issues. DI bags on Cable Car have inlet protection. No spills or discharges observed around site, trash and materials are contained. No corrections requested at this time. Approved.
|
Random Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PART |
Andy J. Long
|
|
|
WIP on frame for building shell. Site has been graded and utilities installed. No permanent stabilization yet, but no trackout, fugitive dust, or sediment runoff occuring.
Perimeter sediment control silt fence is properly trenched and keeping sediment on site to the south along Overland. All surrounding DIs have sediment bags installed. Permits and SWPPP information posted. Rock construction entrance installed at east end of site by active building work. West entrance has been filled in with dirt and currently open to use. Some minor trackout occuring.
1 correction: - Install stabilized entrance, restrict access, or provide schedule of paving/stabilization.
|
Site Preparation | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Evan Jenkins
|
|
|
Mike Phone #: ###-####
Permit Posted Water truck is currently on the move Perimeter Controls installed correctly Approved to begin construction
|
Random Inspection | 7/15/2015 | 7/15/2015 | 7/15/2015 | P | PASS |
Andy J. Long
|
|
|
No activity at Union Square commercial site, though it has been graded. BMPs installed, permit sign posted. No discharges, no significant trackout, and no fugitive dust observed at time of inspection.
|
Permit Ready to Issue | | | 6/30/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/30/2015 | | DONE |
|
|
|
|
Application received | | | 4/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 28 2015 3:18PM
|