General Inspection | 4/5/2016 | 4/5/2016 | 4/5/2016 | | PASS |
Andy J. Long
|
|
|
Exterior work and landscaping complete. No dirt or other material stockpiles onsite. BLD open for interior work; ESC permit conditions satisfied.
|
DOC - Permit Finaled | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/4/2016 | 1/4/2016 | 1/4/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No loose sediment or muddy runoff at site. No corrections.
|
General Inspection | 11/19/2015 | 11/19/2015 | 11/19/2015 | | PASS |
Andy J. Long
|
|
|
WIP on commercial building, exisiting parking lot was not disturbed and project with existing sidwalks and curbing. No spills or discharges from staging area. No corrections needed.
|
Issue & PRINT permit COM | | | 9/1/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/28/2015 | | 8/28/2015 | | DONE |
Andy J. Long
|
|
|
Plan designer submitted interim PD and will take course in October. ESC site map and narrative approved. Need to designate valid Responsble Person.
|
Application received | | | 5/13/2015 | | DONE |
|
|
|
Application submitted via PDS Online on May 13 2015 4:31PM
|
General Inspection | 2/19/2016 | 2/19/2016 | | | |
Mike Jordan
|
|
|
|