Site Final | 9/7/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Andy J. Long
|
|
|
SF removal along both sides of road on drainage ditch.
All silt fence has now been removed. Gary w/ Central Paving called 9/19 to inform me. No further actions neeeded. Warm Spring Bypass area is stabilizeed and in use. No BMPs or loose materials left around site. Approved.
|
General Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 | | PART |
Andy J. Long
|
|
|
Sections of silt fence have been removed since last request. One larger section of drainage ditch still has silt fence installed.
Agreed with RP to extend Site Final to 9/21 due to progress and cooperation. Gary stated it will be done. Silt fence is a temporary linear BMP.
|
General Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | | PEND |
Andy J. Long
|
|
|
final warning to remove silt fences before 9/7/2016 (two weeks). Call and email to Garry with Central Paving
|
General Inspection | 8/8/2016 | 8/8/2016 | 8/8/2016 | | PEND |
Andy J. Long
|
|
|
still need silt fence removal...
|
General Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | | PEND |
Andy J. Long
|
|
|
Silt fence installed along drainage ditches need to be removed in order to final permit. No other issues, road shoulders and disturbed areas have been stabilzed.
|
General Inspection | 7/7/2016 | 7/7/2016 | 7/7/2016 | | PEND |
Andy J. Long
|
|
|
Temp silt fences still installed and have not yet been removed. No site final till removed as requested.
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | | PASS |
Andy J. Long
|
|
|
RP Gary returned call last week to inform that they will remove silt fences and notify the ESC division for site final. No violations or issues at site. Bypass road is in use and surrounding disturbed areas have now revegetated.
|
General Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | | PEND |
Andy J. Long
|
|
|
VM left to RP Garry at Central Paving to provide schedule of temp. BMP removal ( silt fences along the drainage ditches). Out of office till next Monday.
|
General Inspection | 5/20/2016 | 5/20/2016 | 5/20/2016 | | PEND |
Andy J. Long
|
|
|
need to remove temporary BMPs (silt fences). vegetation is established. Request to be sent to Central Paving
|
General Inspection | 5/5/2016 | 5/5/2016 | 5/5/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/20/2016 | 4/20/2016 | 4/20/2016 | | CANC |
Andy J. Long
|
|
|
Warm Springs by-pass has been completed and in use for several months. Permit is open while shoulders vegetate and disturbed area is stabile enough to remove temporary silt fence installations. No inspection conducted at this time. Permit shall remain open.
|
General Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | | PEND |
Andy J. Long
|
|
|
shoulder revegetation and creek crossing stabilization in progress. Temp BMP silt fences are still installed. No violations, but will need to address and/or remove to final permit
|
General Inspection | 3/18/2016 | 3/18/2016 | 3/21/2016 | | PEND |
Andy J. Long
|
|
|
Road shoulders are still revegetating after hydroseeding. Temporary silt fence BMPs installed next to irrigation ditches are still on site and will require removal to final ESC permit.
Appears matting in Warm Springs Creek channel has started to come loose. Will continue to monitor and make correction request once the creek is no longer flowing.
No correction requests issued at this time.
|
General Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 | | PASS |
Andy J. Long
|
|
|
Shoulder revegetation in progress. Silt fences (temporary) still installed till final stabilization.
|
General Inspection | 2/17/2016 | 2/17/2016 | 2/17/2016 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 1/29/2016 | 1/29/2016 | 1/29/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 12/30/2015 | 12/30/2015 | 12/30/2015 | | PASS |
Andy J. Long
|
|
|
Work complete on Warm Springs Bypass road. Revegetation of shoulder and graded areas in progress. Monitoring conditions through winter to make sure there are no significant issues.
|
General Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | | PEND |
Evan Jenkins
|
|
|
Both North and South Sides of Wise Way have been hydromulched/seeded. 3 Areas of Temp BMP's (SIlt Fence) still in place until seed germinates this coming spring. No ESC issues observed at this time
|
General Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PART |
Andy J. Long
|
|
|
Warm Springs by-pass road is now open to vehicles. Shoulders and sidewalk areas have been graded and tracked. Stockpiles of excess dirt have been hauled away. Street has been swept of loose sediment. Drainage is roadside swales.
Graded areas have not yet been hydroseeded/mulched so project area is not yet stabilized per ESC permit conditions.
|
General Inspection | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Andy J. Long
|
|
|
Warm Springs by-pass road
Road surface is now paved, shoulders have been compacted & tracked with drainage ditches. No flow through creek crossing and area has been hydroseeded and tackified. Will monitor grass growth and reaction to stream flow.
No corrections necessary, BMPs installed and no violations observed.
|
General Inspection | 9/3/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on Warm Springs by-pass. Silt fence BMP is installed properly around irrigation ditch and drainage culvert. No significant trackout to Wise or Warm Springs near Old Eckert Road. No corrections issued. Some wind blown dust occuring in the windy conditions. Area south of fire station should be stabilized if grading is complete. Will discuss with contractor next week to see what the schedule is.
|
General Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Andy J. Long
|
|
|
Project now is in full operation. Some fugitive dust onsite, but not fully leaving area of disturbance. Will need to ensure water truck is onsite and speed limits are kept low.
|
Permit Ready to Issue | | | 6/30/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/30/2015 | | DONE |
|
|
|
|
Site Preparation | 6/1/2015 | 6/3/2015 | 6/3/2015 | A | PASS |
Evan Jenkins
|
|
|
At 9 // Garry Phone #: ###-#### Permit Posted on Job Trailer Silt Fence is protected all sides of the unamed canal ditch that runs from North to South through Project. Approved to begin Construction
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/29/2015 | | 6/1/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Harris Ranch Community Infrastructure District No. 1 Warm Springs Bypass. New ACHD Road. 2 Acres of Disturbance in City of Boise's Jurisdiction. Wise Way to heading East, and Connecting back to Warm Springs Ave.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 6/1/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/1/2015 | | DONE |
|
|
|
|
Application received | | | 5/29/2015 | | |
|
|
|
|