Site Final | 11/2/2015 | 11/2/2015 | 11/2/2015 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Culdesac clean with no loose dirt or discharges. Construction waste and material are contained. WIP
|
Site Preparation | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Andy J. Long
|
|
|
would like call ahead; Greg Phone #: ###-####
Site prep conducted with GC Greg and site walk through. Ditch to the south has vegetated buffer and a lot slopes away from ditch line, no extra sediment control needed. GC will monitor trackout and general housekeeping. Permit sign with contact details is posted.
Approved for excavation.
|
Issue & PRINT permit SFD | | | 7/1/2015 | | DONE |
|
|
|
|
Application received | | | 6/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 10 2015 4:18PM
|