General Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | | DONE |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Evan Jenkins
|
|
|
Project Complete ESC Conditions Satisfied
|
General Inspection | 5/30/2016 | 5/30/2016 | 5/30/2016 | | CANC |
Evan Jenkins
|
|
|
Holiday
|
General Inspection | 5/13/2016 | 5/13/2016 | 5/13/2016 | | PASS |
Evan Jenkins
|
|
|
construction complete ESC conditions satisfied
|
General Inspection | 4/28/2016 | 4/28/2016 | 4/28/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg still needs to be established
|
General Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | | PEND |
Evan Jenkins
|
|
|
re-veg
|
General Inspection | 3/11/2016 | 3/11/2016 | 3/11/2016 | | PASS |
Troy James
|
|
|
No violations noted
|
General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 2/9/2016 | 2/9/2016 | 2/9/2016 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout from site access points. Perimeter BMPs installed.
|
General Inspection | 1/6/2016 | 1/6/2016 | 1/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No major trackout considering wet conditions. MS4 inlet at Fairview has sediment filter bag installed.
|
Random Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Andy J. Long
|
|
|
Minimal activity at new Fairview Tates Rents site. Perimeter wattles installed and DI bag. No trackout or other issues. Approved.
|
Site Preparation | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Andy J. Long
|
|
|
Nate Phone #: ###-####
ESC Permit sign posted and ESC plan on site. Perimeter wattles have been installed as well as DI protection on Bryson Street stormdrain.
Work to really begin next week, will have water truck(s) on site for dust supression/compaction.
Approved.
|
Conference | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PASS |
Evan Jenkins
|
|
|
Nate Phone #: ###-####
Talked via phone about not needing to place waddles per site map above grade from where construction is taking place. Water and dirt doesn't flow uphill
|
Issue & PRINT permit COM | | | 9/9/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/13/2015 | | 8/13/2015 | | DONE |
Andy J. Long
|
|
|
ESC plan approved under BLD15-01780 application packet. ESC site preparation inspection is required. Permit issued with GRD for eary start. Need to designate RP.
|
Application received | | | 6/24/2015 | | |
|
|
|
|