Site Final | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Andy J. Long
|
|
|
Down gradient inlet was removed and disposed of offsite and gutter was swept and cleaned as requested.
ESC condtions satisfied. Notified Alturas that all permits on Grand Prairie in RH#5 are finaled.
|
Site Final | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | NR |
Andy J. Long
|
|
|
Need to remove DI bag on River Basin and clean up sediment and dirt accumulated outside of inlet. Will check back 8/5
Verbal correction request left to Alturas Construction to remove DI bag for site final. BLD is finaled.
|
Aging Inspection | 5/30/2016 | 5/30/2016 | 5/30/2016 | | CANC |
Evan Jenkins
|
|
|
Holiday
|
Aging Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. ESC permit finaled. Pool permit on parcel issued seperately and still in progress.
Alturas Construction still in progress on two SFHs on Grand Prairie, at that time DI bags on River Basin need to be removed and gutters/sidewalks well swept. Correction requested on ESC15-01518
|
Aging Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | | PART |
Andy J. Long
|
|
|
Need to sweep up after landscaping is complete. Loose sediment and dirt on sidewalk and roadway. Home construction complete
|
General Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | P | PASS |
Eric Strole
|
|
|
|
Issue & PRINT permit SFD | | | 8/5/2015 | | DONE |
|
|
|
|
Application received | | | 7/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 2 2015 9:21AM
|