Site Final | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Andy J. Long
|
|
|
Gunner Phone #: ###-####
Project complete, turf installed. Construction fencing to remain in place to allow turf to establish.
Stockpile of sand removed and swept, DI bag removed. ESC permit conditions satisfied.
|
General Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Andy J. Long
|
|
|
Ann Morrison soccer field re-grading and turf installation is in progress. Turf from Basque friendly is now on Field #3 and is surrounded by security fence and already inhabited by geese. A stockpile of sand in adjacent parking lot should be removed and area swept.
Now Precision grading is working on leveling #4. No trackout from work entrance, no fugitive dust issues, permit sign is posted.
Approved.
|
General Inspection | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | PASS |
Andy J. Long
|
|
|
Ann Morrison Park - turf removal and grading
WIP on setting up orange perimeter fencing and tractor is removing grass on field 3. No dust or trackout. Approved.
|
Application received | | | 7/2/2015 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/2/2015 | | 7/2/2015 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative submitted and approved. Valid RP and PD. ESC plan submittal requirements satisfied. Site prep inspection will be conducted first week of project. Precision Grading contact is Gunner ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2015 | | DONE |
|
|
|
all requirments met
|
Issue & PRINT permit COM | | | 7/2/2015 | | DONE |
|
|
|
|