General Inspection | 7/7/2016 | 7/7/2016 | 7/7/2016 | | PASS |
Andy J. Long
|
|
|
Lot has been prepped for future construction of 2 SFH. Banks of lot are vegetated and dirt and sediment contained onsite. DI bag installed in good condition. To be used for the new construction.
|
DOC - Permit Finaled | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | | PEND |
Evan Jenkins
|
|
|
No Activity
|
Random Inspection | 6/6/2016 | 6/7/2016 | 6/6/2016 | A | PEND |
Evan Jenkins
|
|
|
Phone #: ###-####
No activity: contractor to begin building a new SFH soon. Some minor trackout from what appears to be from public brats. ESC sign needs to be replaced with new, with contractor info
|
General Inspection | 5/26/2016 | 5/26/2016 | 5/26/2016 | | CANC |
Andy J. Long
|
|
|
no activity at this site. Site stable
|
General Inspection | 5/11/2016 | 5/11/2016 | 5/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | | PEND |
Evan Jenkins
|
|
|
no activity needs re-vegetation
|
General Inspection | 4/11/2016 | 4/11/2016 | 4/11/2016 | | PEND |
Evan Jenkins
|
|
|
no activity
|
General Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 | | PEND |
Evan Jenkins
|
|
|
No activity needs re-veg
|
General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 2/9/2016 | 2/9/2016 | 2/9/2016 | | PASS |
Evan Jenkins
|
|
|
|
Aging Inspection | 1/19/2016 | 1/19/2016 | 1/19/2016 | | PASS |
Evan Jenkins
|
|
|
No activity at time of inspection
|
Tracking Control | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | FAIL |
Evan Jenkins
|
|
|
No Construction Entrance installed, significant trackout occuring.
Contacted RP Michael Jobes 869.5550 via cell. Disclosed while driving by, significant track out occuring onto W. Hill Rd, with No Construction Entrance. He stated he will get one installed asap and get the street swept. Will follow up tomorrow to ensure they get back into compliance.
|
Conference | 7/28/2015 | 7/30/2015 | 7/30/2015 | P | PASS |
Andy J. Long
|
|
|
check for BMPs...
DI bag now installed. Will preserve existing vegetation along roadway for this current phase.
|
Random Inspection | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | FAIL |
Andy J. Long
|
|
|
No discharges or significant track out but work has started without BMPs installed.
Verbal Correction request to RP M. Jobes to install DI bag and perimeter wattles.
|
Site Preparation | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | PASS |
Andy J. Long
|
|
|
8:30 AM requested by Jordan ###-####
Met RP and GC onsite. Work to begin next week. Permit sign posted.
BMPs needed are DI filter bag on corner of Hill & Castle and a perimeter sediment control around the street corner frontage to keep bike lane clean.
Approved.
|
Issue & PRINT permit SFD | | | 7/13/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/9/2015 | | 7/9/2015 | | DONE |
Andy J. Long
|
|
|
Per Andy: Grubbing Lot, Removing Concrete Driveway. Prepping lot for minor Land Division (Seperating Parcel into 2) for future Townhomes.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 7/9/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2015 | | DONE |
|
|
|
called Michael to let know permit is ready and how much is owed
|
Application received | | | 7/8/2015 | | |
|
|
|
|