General Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 | | PASS |
Andy J. Long
|
|
|
Retail center complete and surrounding area is lanscaped and stabilized. New storm drains for the Kensington/North Pointe complex has sediment filters installed due to active residential construction. BLD finaled, no further ESC actions required..
|
DOC - Permit Finaled | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 9/20/2016 | 9/21/2016 | 9/21/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2016 | 9/20/2016 | 9/20/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 9/5/2016 | 9/5/2016 | 9/5/2016 | | CANC |
Evan Jenkins
|
|
|
holiday
|
General Inspection | 8/19/2016 | 8/19/2016 | 8/19/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/4/2016 | 8/4/2016 | 8/4/2016 | | PEND |
Evan Jenkins
|
|
|
minor re-vegetation needs to be completed prior to ESC permit being Finaled
|
General Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PEND |
Evan Jenkins
|
|
|
Near Completion No isssues observed at this time
|
General Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/16/2016 | 6/20/2016 | 6/20/2016 | A | PASS |
Andy J. Long
|
|
|
Trash in swale picked up. Staging area in process of being dismantled and left under control of the Kensington Development group as a future commercial site.
|
General Inspection | 6/16/2016 | 6/16/2016 | 6/16/2016 | | PEND |
Andy J. Long
|
|
|
North Pointe #3 is complete. Final staging area clean up is needed to final ESC.
Request to Radix to clean up around the stormwater swale at Saxton and State. Remove silt fence, wind blown litter and debris. Onsite supervisor for Radix stated
NP # 1 ESC15-01292 open NP # 2 ESC15-00894 closed out NP # 3 (this permit, open for corrections listed above) NP # 4 ESC15-01293 closed out
|
General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 | | PASS |
Evan Jenkins
|
|
|
Inspected site yesterday. no ESC issues
|
General Inspection | 5/17/2016 | 5/17/2016 | 5/17/2016 | | PASS |
Andy J. Long
|
|
|
WIP at North Pointe commercial. Access road is now paved, so no trackout outside of developement. Private storm drains onsite have sediment protection and they are trying to keep construction traffic off permeable pavers.
No discharges offsite, no fugitive dust issue. Saxton and State street are in decent condtion. Need to removal old boards in gutter that were used for a temporary ramp.
|
General Inspection | 4/28/2016 | 4/28/2016 | 4/28/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/13/2016 | 4/13/2016 | 4/13/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: some internal roads have been paved, along with curb and gutters. No ESC issues observed at this time
|
General Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | | PASS |
Evan Jenkins
|
|
|
|
Tracking Control | 2/23/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Andy J. Long
|
|
|
Sweeping was performed as requested. No trackout, discharges, or fugitive dust observed. Still need to continue weekly sweeping.
|
General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | | PART |
Andy J. Long
|
|
|
Verbal correction request to Steve with Radix to sweep up Saxton. Will reinspect for compliance 3/3
No other violations
|
General Inspection | 1/26/2016 | 1/26/2016 | 1/26/2016 | P | PASS |
Andy J. Long
|
|
|
No trackout. Dirt ramp has been removed. Streets swept weekly. No turbid or polluted runoff from site observed.
|
General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | PART |
Andy J. Long
|
|
|
Trackout onto Saxton occuring due alternate entrance being used while access road is being installed. Significant amount of mud on Saxton. Curb cut inlet drops into intercepter but cannot be fitted with filter fabric or other BMP without causing roadway hazard or flooding.
Will request rock entrance once snowy conditions allow. No major trackout, no discharges offsite.
|
Conference | 12/1/2015 | 12/2/2015 | 12/4/2015 | P | PEND |
Andy J. Long
|
|
|
Roadway this afternoon. Ramp was completely frozen earlier in week and could not be moved.
Some turbid runoff in gutter. DI has filter bag and discharges to sand window installed as part project SW infrastructure. No connection to MS4-river.
Will check monday for conditions, too wet to sweep currently.
|
General Inspection | 11/25/2015 | 12/1/2015 | 12/1/2015 | P | PEND |
Andy J. Long
|
|
|
Follow up inspection for North Pointe Retail...
No significant trackout from site and no discharges from site.
Site still needs to conduct sweeping on State Street and remove the temporary ramp over the curb to job trailer.
Streets have still not been able to be paved...
|
Complaint Inspection | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | PART |
Andy J. Long
|
|
|
Trackout complaint and mention of lack of BMPs
Keith ###-####
DIs have sediment sack installed on both sides of Saxton at State Street. Construction entrance is not effectively preventing trackout.
Correction issued to remove compacted gravel & dirt access ramp and install stabilized rock entrance to access Radix job trailier. Road into site worked on by Knife River is scheduled to be paved first week of December, so will allow sweeping of significant trackout until then instead of installation of angular rock entrance . Once paved, Radix will install construction entrance off the new road.
Site perimeter along State Street is in process of being stabilized as well as road and stormwater improvements. See also ESC15-00894 and ESC15-00504 (main Kensington/North Pointe 22 acre disturbance permit)
Will reinspect next Tuesday.
Knife River contact Mike - ###-#### Radix contact Steve - ###-####
|
Issue & PRINT permit COM | | | 10/8/2015 | | DONE |
|
|
|
|
Application received | | | 7/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 11 2015 4:05PM
|