Site Final | 7/28/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Andy J. Long
|
|
|
check for temp BMP removal . Issue re-inspection fee if not complete. Requested to RP 2x
Sediment bag in storm drain on Spinnaker was removed . Plastic/textile wattles around sand window on Holden were removed. ESC permit conditions satisfied. All ESC permits in Tianna Park are finaled.
|
Site Final | 7/25/2016 | 7/27/2016 | 7/28/2016 | P | NR |
Andy J. Long
|
|
|
Temp BMPs still installed. Second verbal request to remove issued to Sunrise Homes
|
General Inspection | 7/25/2016 | 7/25/2016 | 7/25/2016 | | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and hard surfaces swept of loose materials.
Request to RP-GC to remove DI bag on Spinnaker and will final all Tianna Park units.
|
General Inspection | 7/7/2016 | 7/7/2016 | 7/8/2016 | | PEND |
Andy J. Long
|
|
|
|
General Inspection | 6/22/2016 | 6/22/2016 | 6/22/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/6/2016 | 5/6/2016 | 5/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP. 3 homes in Tianna Park remaining. Once complete street sweeping and DI bag removal shall be required. No corrections needed at this time.
|
General Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Andy J. Long
|
|
|
WIP. DI bag installed. Several homes in Tianna Park being landscaped at once. No trackout or other violations.
|
General Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | PART |
Andy J. Long
|
|
|
WIP on interior. Some loose dirt in gutter, but DI bag installed and has capacity. RP will sweep up this week. No discharges, trackout, or spill stains observed. Trash contained.
|
General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | | PASS |
Andy J. Long
|
|
|
WIP. No corrections issued.
|
Site Preparation | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | CANC |
Andy J. Long
|
|
|
|
Issue & PRINT permit SFD | | | 9/21/2015 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/21/2015 | | DONE |
|
|
|
|
Application received | | | 7/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2015 3:56PM
|