Site Final | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PASS |
Andy J. Long
|
|
|
Trevor Phone #: ###-####
Area of construction is stabilized. No loose sediment or other materials. Crew to remove DI in private drain during next scheduled maintenance.
No further ESC inspections required.
|
Site Final | 4/14/2016 | 4/14/2016 | 4/15/2016 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 4/5/2016 | 4/5/2016 | 4/5/2016 | | PART |
Evan Jenkins
|
|
|
Remove temp BMP's (drop inlet protection)
|
Issue & PRINT permit COM | | | 9/18/2015 | | DONE |
|
|
|
|
Application received | | | 7/22/2015 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/22/2015 | | 7/22/2015 | | DONE |
Andy J. Long
|
|
|
ESC plan and site map submitted and approved. Valid RP/PD designated.
|