Aging Inspection | 6/19/2017 | 6/19/2017 | 6/20/2017 | | PASS |
Andy J. Long
|
|
|
Chaucer sub roads and infrastructure complete. All parcels under construction or stabilized. SFHs permitted seperately. No further ESC inspections on this permit.
|
DOC - Permit Finaled | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/17/2017 | 4/18/2017 | 4/18/2017 | P | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Aging Inspection | 2/13/2017 | 2/13/2017 | 2/14/2017 | | CANC |
Melissa Jannusch
|
|
|
|
Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/10/2016 | 10/10/2016 | 10/11/2016 | P | FAIL |
Andy J. Long
|
|
|
Need to install designated lined washout for SFH builders. Currently no washout. Dumping on open lots, no containment and creating trackout issue.
Correction request issued to subdivision devlopment, Guy H. ###-####
|
Aging Inspection | 8/24/2016 | 8/24/2016 | 8/24/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Evan Jenkins
|
|
|
WIP: No ESC Issues Observed at this time. No Discharges leaving site, nor trackout or dust issues
|
Aging Inspection | 6/13/2016 | 6/13/2016 | 6/13/2016 | | PASS |
Evan Jenkins
|
|
|
No issues observed
|
Aging Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Andy J. Long
|
|
|
Grading, utility, and road built. Parcels ready for SFHs. No construction occuring. Sediment filter bag installed on the newly installed storm drain on Linda Vista. No violations, no corrections needed at this time.
|
Aging Inspection | 2/11/2016 | 2/11/2016 | 2/11/2016 | | CANC |
Evan Jenkins
|
|
|
|
Site Preparation | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Evan Jenkins
|
|
|
Rod// please call before Phone #: ###-####
Permit Posted along with BMP's installed Approved for construction
|
Telephone call | | | 8/14/2015 | | DONE |
|
|
|
Spoke with Andrew informing him that there doesn't need to be a GRD permit, but there is still an ESC permit. Everything is ready to be picked up and there are no fees that are due
|
Permit Ready to Issue | | | 8/14/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 8/14/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/13/2015 | | 8/13/2015 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narrative approved. Valid PD and RP designated.
|
Application received | | | 7/22/2015 | | |
|
|
|
|