Site Final | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Evan Jenkins
|
|
|
Please call once the inspection is done Tim Phone #: ###-####
Temp BMP's removed, asphalt re-paved. ESC Conditions Satisfied
|
Site Preparation | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | CANC |
Evan Jenkins
|
|
|
Tim Phone #: ###-####
No Site Prep Inspection Required for this minor project
|
Routing - Erosion and Sediment | 8/11/2015 | | 8/13/2015 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved for storm drain box excavation, replacement, and installation of new interceptor. Approved. Valid RP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/13/2015 | | DONE |
|
|
|
ALL REQUIREMENTS MET
|
Telephone call | | | 8/13/2015 | | DONE |
|
|
|
Left a message for Tom informing him that this permit is ready and the fee amount that is due
|
Issue & PRINT permit COM | | | 8/13/2015 | | DONE |
|
|
|
|
Application received | | | 8/11/2015 | | |
|
|
|
|