General Inspection | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | CANC |
Andy J. Long
|
|
|
duplicate inspection
|
DOC - Permit Finaled | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Remain site and offsite utility work covered under ESC15-01534
|
General Inspection | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: no discharges leaving the site at time of inspection.
|
General Inspection | 5/4/2016 | 5/4/2016 | 5/5/2016 | | PASS |
Andy J. Long
|
|
|
WIP. Some minor trackout from site needs to be swept during regular housekeeping. No discharges from site. DI in front of project has sediment filter bag installed.
|
BMP Violation | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Andy J. Long
|
|
|
check for sweep up of gutter and street
Some sweep up has occured. Now sidewalk is being removed for utilities so will need to swept again when complete,. No trackout extending down street from Darigold. Approved for now but will need sweeping several times this week
|
General Inspection | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PART |
Andy J. Long
|
|
|
No significant trackout or discharges observed. Lots of unswept sediment and gravel
Correction request:
Sweep street around the inlet in front of the plant.
|
Site Preparation | 1/8/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Andy J. Long
|
|
|
TJ ###-####
ESC plan review and site walk through conducted with Nelson Industrial RP.
BMPS installed include: - ESC permit sign posted on job trailer visibly - Rock construction entrance installed - MS4 inlets have sediment filter bags - leakproof concrete washout will be utilized - ESC plan and inspection log on site in trailer
Construction commenced prior to site prep, but site is in good condition with BMPs; out of town contractor is now aware of the site prep requirement for future reference.
|
Issue & PRINT permit COM | | | 12/4/2015 | | DONE |
|
|
|
|
Application received | | | 8/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 24 2015 1:21PM
|