Aging Inspection | 4/12/2016 | 4/12/2016 | 4/12/2016 | | PASS |
Andy J. Long
|
|
|
All permits finaled. Home complete and stabilized, no sediment leaving site. ESC permit conditions met.
|
DOC - Permit Finaled | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. Frame is up. No earthwork occuring at time of construction and existing vegetation was preserved as much as possible. No trackout or other issues at site, no corrections.
|
Site Preparation | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Evan Jenkins
|
|
|
Jared Phone #: ###-####
Permit Posted in front of lot on fence: Perimeter Silt Fence Installed per manufacture spec. Approved for Construction
|
Permit Ready to Issue | | | 9/18/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 9/18/2015 | | DONE |
|
|
|
|
Application received | | | 8/31/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 31 2015 12:47PM
|