Site Final | 10/14/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Andy J. Long
|
|
|
Construction complete, home is lanscaped and loose materials around site have been cleaned. No erosion issues on bank below home observed. ESC conditions satisfied.
|
General Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | | PASS |
Andy J. Long
|
|
|
Near comrpletion. BLD open, yard is landscaped and final clean up is in progress. No trackout or discharges. Scheduled Site Final for next Friday.
|
General Inspection | 9/28/2016 | 9/29/2016 | 9/30/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled 9/29
|
BMP Violation | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | CANC |
Andy J. Long
|
|
|
|
BMP Violation | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PEND |
Andy J. Long
|
|
|
|
General Inspection | 9/12/2016 | 9/12/2016 | 9/12/2016 | | FAIL |
Andy J. Long
|
|
|
Active dirt work in progress, trackout and loose sediment in road and gutter. Lots of dirt around inlet and in inlet bag.
Correction request: clean up needed before the end of theday
verbal correction issued to Canyon Crest Homes.
|
General Inspection | 8/26/2016 | 8/26/2016 | 8/26/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 8/11/2016 | 8/11/2016 | 8/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/27/2016 | 7/27/2016 | 7/27/2016 | | PASS |
Andy J. Long
|
|
|
BMPs installed. Receiving DI recently cleaned. No discharges or sediment runoff occuring. SFH near completion.
|
General Inspection | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Andy J. Long
|
|
|
WIP. Silt fence installed at bottom corner where runoff exits lot. No trackout. Trash and materials are contained.
|
General Inspection | 7/8/2016 | 7/8/2016 | 7/8/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for Eyrie C inspection day 7/11
|
General Inspection | 6/23/2016 | 6/23/2016 | 6/23/2016 | | PASS |
Andy J. Long
|
|
|
Sediment blown off lot due to sprinkler line failure has been cleaned and silt fence reinstalled. Work on interior is ongoing. Site is in compliance, no correction requests issued.
|
General Inspection | 6/7/2016 | 6/7/2016 | 6/9/2016 | | PART |
Andy J. Long
|
|
|
WIP on interior. Driveway and landscaping not yet installed. No trackout, no discharges at time of inspection.
Sprinkler line blow out caused sediment runoff underneath silt fence at bottom of site. Wallboard waste pile has some peices on sidewalk - need to contain to avoid crushing.
Request to work with EC #7 permittee to change out all DI bags on Bent Bow.
|
General Inspection | 5/23/2016 | 5/23/2016 | 5/23/2016 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 5/4/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Andy J. Long
|
|
|
Framing in progress. Trash and materials contained on site. No corrections needed at this time.
|
General Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 5/5
|
Conference | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | DONE |
Andy J. Long
|
|
|
Left VM with Canyon Crest homes Dave Wipple to notify concrete drivers not to use the un-lined washout at Eyrie Way and Villa Ridge. It has caused trackout, and is leaking into ground next to Stewart Gulch. CC Homes and Eyrie Canyon developer need to provide leak-proof containment of washout and maintain it regularly
|
Site Preparation | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PART |
Andy J. Long
|
|
|
Dave Phone #: ###-####
Permit sign posted and silt fence BMP is properly trenched in.
Correction: - need to empty out and reinstall the DI bag in front of home.
Approved to start.
|
Issue & PRINT permit SFD | | | 1/28/2016 | | DONE |
|
|
|
|
Application received | | | 9/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2015 8:19AM
|